服务热线
4001-123-456
On September 9th, the water intake channel of the Nanning Pumped Storage Power Station in Guangxi was successfully filled, marking the completion of the power station's water transmission system project and laying a solid foundation for its completion and operation within the year. The Nanning Pumped Storage Power Station, located in Wuming District, Nanning City, Guangxi Province, has been filled with water through a 19 day water diversion channel. The water is divided into sections and injected into a channel with a length of 1737 meters and a maximum diameter of 9 meters, with about 110000 cubic meters of high-pressure water flow. After the first filling is completed, it marks the completion of the water transmission system project of the pumped storage power station.
